Velocity Chart

Velocity Chart#

The “Velocity Chart” widget compares, for each sprint, the planned scope (Predicted) with the scope that was actually completed (Real). An item counts as completed if it reached one of the final statuses within the sprint’s dates. This helps you see how much your team gets done per sprint and plan the next sprints realistically.

For this widget you can configure:

  • Title: the heading of the widget

  • Items from: a workspace or release (Workspace/Release) or a Filter

  • Final status: the statuses that count as done; by default all closed statuses

  • Effort type: Effort, Number of items or Story points

  • Field for story point value: the field that holds the story points (only for Story points)

  • Chart Type: Line chart or Bar chart

  • Rotate X-axis labels