Work and cost gauge

Work and cost gauge#

The “Work and cost gauge” widget shows a gauge for one workspace. It compares the actual and remaining work or costs with the planned values and shows the deviation in percent. Green, yellow and red ranges show at a glance whether the workspace is within plan.

For this widget you can configure:

  • Title: the heading of the widget

  • Workspace: the workspace to evaluate (on a workspace cockpit: Workspace/Release)

  • Calculation mode: Material, Work in workdays, Work in working hours, Total cost or Profit

  • Start of red range: a deviation from the plan above this percentage puts the needle in the red range